Investors

Is Your Data Center Tired Or Underperforming?

COOLING UPGRADES CAN BOOST YOUR DATA CENTER’S ENERGY FOR HIGHER EFFICIENCY AND PROTECTION



Scenarios and Benefits

FOUR NEW SCENARIOS THAT SHOW HOW TO IMPROVE DATA CENTER PERFORMANCE



 

Replace Obsolete
Cooling Units
Within a
Tight Budget


Annual Energy Savings: $333,000
Payback Period: Under 4 Years


View Video
View Application Note


Upgrade or Replace
Old Equipment
Within Existing
Replacement Schedule


Annual Energy Savings: $125,000
Payback Period: 2.1 Years


View Video
View Application Note


Replace 10-Year-Old
Equipment for
Higher Protection
and Efficiency


Annual Energy Savings: $135,000
Payback Period: 19 Months


View Video
View Application Note


Upgrade
New Equipment
for Higher
Efficiency


Annual Energy Savings: $55,000
Payback Period: 18 Months


View Video
View Application Note

See How Other Companies Are Becoming More Efficient With Retrofits



Case Study: QTS

QTS


  • Exceeded minimum ROI estimates by 40 percent
  • 2.5-Year Payback Period
Case Study: American Family Insurance

American Family Insurance


  • Reduced CRAC fan energy consumption by 74%
  • Payback Period of 2.02 Years
Case Study: Verizon Wireless

Verizon Wireless


  • Reduced annual energy usage by 1,752,000kWh
  • Reduced annual CO2 by 572 metric tons
INVESTORS
Overview

Language & Location