Investors

Vertiv XTE Platform Series Cell Site Installation

July 30, 2017

Vertiv XTE Platforms can be installed in eight hours or less. Pre-configuration and testing of equipment can be done on the fully equipped platform in our factory. This speeds up deployment times and minimizes on site risks. The fully equipped platform can be installed on innovative helical pillars that are driven into the ground well below the frost line, eliminating the need for a concrete pad. Multiple sites can be deployed quickly and cost effectively by leveraging standardized form factors.