Background
Established in 2009, Micron21 started out as a contract supplier to Australia Post. Since then, it has transformed its original Melbourne facility into a high-efficiency, managed service provider led by its pioneer and Managing Director James Braunegg. Today, Micron21 prides itself in holding a niche position in the market by offering quick turnarounds to solutions ranging from single websites to complete enterprise grade data centre solutions and Network Security Products. Micron21 hosts a large array of high-profile clientele, including local, national and international businesses and government agencies all of whom are relying on Micron21 to provide mission critical services 24 x 7.
Case Summary | |
---|---|
Location: |
Australia |
Vertiv Solution: |
|
The Situation: |
Micron21’s ultimate goal was to have their data centre awarded an Uptime Institute Tier IV Fault Tolerant Facility. The first step in that process is the Tier Certification of Design Documents. A Tier IV Fault Tolerant classification includes high reliability and active fault monitoring and management capabilities that will provide continuous and stable power despite maximum IT loads. |